How to install the bathtub correctly

by:KingKonree     2021-05-16

The bathtub is a large part of the bathroom. During the installation process, a little carelessness will cause a lot of trouble, so the installation method of the bathtub should be paid special attention. So how to install the bathtub? What are the installation methods of the bathtub? Next, the editor of Jiuzheng Building Materials Network will answer these questions for you.

The first step is to choose the right size bathtub according to the specifications of the bathroom. I believe everyone will notice this. Choose the right bathtub size according to the size of your bathroom. Therefore, in the early stage of installation, you must first compare the size of the bathtub and the space reserved for the bathroom.

Before installing the bathtub, clean the bathtub, remove the screws on the legs of the legs, insert the squeeze female into the bottom groove of the bathtub, buckle the legs on the bathtub, wear the nuts, and tighten them. Leveling. When the bathtub is like a bricklaying leg, the brick legs should be built, cement mortar should be applied, and the bathtub should be placed on the brick platform and leveled; if the bathtub does not match the brick platform, it can be filled with cement mortar and smoothed.

When installing the bathtub drain, put the bathtub drain tee nut on the drain horizontal pipe, wrap the asbestos rope, insert the middle port of the tee, tighten the nut, install the copper pipe into the drain pipe at the lower port of the tee Inside the mouth, the lower end of the copper pipe is turned up, put a rubber cushion under the disc of the bathtub lower mouth, put putty on, insert the bathtub drain hole, put on the rubber cushion and eye circle outside, put lead oil, wind hemp, put putty on the threaded area. Use a fork to catch the cross ribs of the drain and into the elbow of the drain. Put a nut on the overflow riser pipe, wrap the oil packing rope, insert the upper mouth of the tee, aim at the overflow hole of the bathtub, tighten the nut, add a 1mm thick rubber pad to the elbow of the overflow pipe, apply putty, and pass the bolt through On the 'one' thread button in the water elbow of the over-long pipe, it is enough if it is not loose. Wrap the oil asbestos rope at the junction of the bathtub drain tee and the drain pipe, twist it firmly, and then seal it tightly with putty.

When installing a long-neck faucet in a bathtub, such as installing a hot and cold water faucet on the wall, first align the top of the water pipe with a short pipe, measure the size of the nipple, and wire the pipe. , Put one end of the oil around the twine, screw it into the nozzle, tighten and align it, and remove the twine. For example, when installing a mixed water gate with shower, remove the plugs of the cold and hot water pipe ports, use a short pipe with a threaded end to fit into the pipe port, try to align it, and put lead oil on the water inlet of the mixed water door and screw on the protective port. , Insert the key into the inlet, install it into the cold and hot water pipe port, check the size, keep the mouth close to the wall, then align the mixing nozzle with the inlet, tighten the nut, try to level it, and make a mark when it is suitable, and set the mixing water gate Uninstall, re-greased and numb before installation.

The editor of Jiuzheng Building Materials Network reminds: As long as you pay attention to the above problems when installing the bathtub, you will avoid a lot of troubles, and hope to help you.