< img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=5785916&fmt=gif" />

KingKonree - Solid Surface Manufacturer of Sanitary Ware, Solid Surface Countertops & Sheets for over 24 years, innovation in moulding and thermoforming

Meet KingKonree(KKR) at 135th Canton Fair: Booth No: 11.1 C05-06. April 23th to 27th 2024

How to install the overall shower room?

by:KingKonree     2021-05-14

Integral shower room is a non-steam generating device, a sanitary unit consisting of a spray device, shower room body, shower screen, top cover, bottom basin or bathtub. The basic structure of the shower room is a chassis and a fence. The chassis mostly uses diamond, acrylic, fiberglass, etc. Different sizes. 900×900mm and 1000×1000mm are more suitable for home use. The fence frame is mostly made of aluminum alloy, and the outer layer is sprayed with plastic, which is not corroded and rusted. The fence is equipped with PS plastic panels, FRP panels or cloth-patterned tempered glass doors and chrome-plated handles for easy entry and exit.

How to operate the overall shower room installation process? In fact, the glass used in the shower room is usually tempered glass processed by physical methods. The glass is heated to a certain temperature and then cooled suddenly. The glass changes the crystal structure of the glass part, improves the surface hardness, the impact resistance of the glass, and the bending strength is more than ten times higher than that of ordinary glass.

Integral shower room installation process one

Preparation and installation of the bottom basin, the installation of the bottom basin must be careful, water testing is an indispensable part, to see if the product packaging is complete After opening, check whether the configuration is complete. Prepare the necessary tools and put them together for easy access. Next, prepare to install the low basin, assemble the bottom basin parts, adjust the level of the bottom basin, and ensure that there is no water in the basin and the bottom of the basin. The hose can expand and contract with the distance. After the basin bottom and the floor drain are firmly connected, a water test is required to ensure that the water is unimpeded. Before the installation of the house, the installed bottom basin should be protected in time.

Integral shower room installation process two

Clarify the pipe arrangement in the bathroom to prevent the hidden pipeline from exploding when drilling holes. Use a pencil and a level ruler to determine the drilling position of the aluminum against the wall, and drill the hole with a percussion drill. Whether the shower room is safe or not has an important relationship with the proper installation of the room body. Whether the location and punching is accurate, whether the fittings are installed tightly, and whether the waterproof seal is done well, etc., all affect the normal use of the product. Knock in the rubber particles in the drilled hole, and lock the aluminum strip to the wall with screws. Note that it needs to be continuously adjusted while installing to maintain the verticality of the aluminum material.

Integral shower room installation process three

When fixing the glass, clamp the glass to the drilled hole of the bottom basin, and the bottom of the flat glass or curved glass falls into the glass clamp groove. Slowly push in the wall-mounted aluminum material. Fix it with screws. After fixing the glass, find the corresponding position on the top of the glass to drill holes, install the (straight/oblique) fixing seat and connect the jacking pipe. Fix it to the top of the glass with an elbow sleeve. Install the object rack at the calibrated position, tighten the layer nut, fix the layer glass, and keep it vertical and horizontal. Pay attention to waterproofing under the aluminum material of the fixed glass. Install the hardware of the movable door, and install the hinge on the reserved hole of the fixed door. After installation, adjust the position of the shaft core of the lotus leaf until the closing feel is the best.

Integral shower room installation process IV

Install suction strips or water retaining strips on the side or under the glass as required. Use silica gel to close the joints between the aluminum and the wall, the glass and the bottom basin. Check whether each part is comfortable and smooth to use, and adjust in time if any problems are found. Tighten the corresponding screws after adjustment to make the entire shower room stronger. Wipe the entire shower room with a rag.

Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Leave Your Message inputting...