< img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=5785916&fmt=gif" />
loading

KingKonree - Solid Surface Manufacturer of Sanitary Ware, Solid Surface Countertops & Sheets for over 24 years, innovation in moulding and thermoforming

 

Rifeng Sanitary Ware explains the things that must be known before the bathtub is installed

by:KingKonree     2021-09-12
Rifeng Sanitary Ware explains the things that must be known before the bathtub is installed. The bathtub is the main equipment of the bathroom. There are many types and sizes of bathtubs, which can be summarized into three types: deep square, shallow long and eclectic. So what do we have to be familiar with before installing the bathtub? Today I will give you a detailed explanation. 1. Inspection My bathtub was sent in between two boards with borders. Bring it indoors, use pliers to pull off the horizontal steel hoop, remove the upper cover, and check the ceramic surface cast iron cylinder block against the order model. 2. Assemble Open the box with the bathtub draining water, pay attention to check the contents first, and prevent the operation environment from being too messy and causing the accessories to be confused or even omitted. For example, there are three black gaskets, two large and one small, and they are distinguished by direction, which may cause water leakage. Let the bathtub roughly lie on its side, bend the copper pipe to conform to the shape of the bathtub to facilitate fixing, and then screw the upper and lower water hoses. This will be known at a glance. 3. Test the water Put a bucket of water in the bathtub, and then block the outlet of the hose for the water, check whether the joints are leaking, and whether the copper hose is in good condition, because the cast iron bathtub weighs about two hundred kilograms, check it after it is in place It is very inconvenient to troubleshoot and deal with water leakage. Fourth, the position where the bathtub can be blocked can not be tiled on the wall and floor. According to the illustrated size of the bathtub and the on-site measurement size, determine the positions where the four cast iron contacts on the cylinder body contact the ground. Place two red bricks at the contact positions, and level the horizontal and vertical diagonally. 5. It is best to move the bathtub with three people to ensure the safety of each unit. Lift gently, fine-tune it in place, and insert the sewer hose into the drainage pipe that has reached a level slightly above the ground. The spirit level is leveled horizontally and vertically on the cylinder body diagonally, and the four feet are fine-tuned. 6. Make the skirt Use red bricks to build a non-load-bearing wall skirt in the direction where it is necessary to make the skirt. Leave an inspection opening in the middle of the overall height of the bathtub at the upper and lower water positions. The size I think is at least 200*300, otherwise it is only for observation and does not have the inspection function. The aluminum alloy cover can be customized for the access opening, which is relatively beautiful. 7. The brick wall skirt is well laid and the next day tiling is relatively suitable. After the bathtub is installed, the wall skirt is about 500 high. Depending on the specifications of the skirt brick, try to seam with the bathroom wall and floor tiles as much as possible. If there are narrow strips, consider using waist line as decoration. (
Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Leave Your Message inputting...