loading

        KingKonree - Solid Surface Manufacturer of Sanitary Ware, Solid Surface Countertops & Sheets for over 25 years, innovation in moulding and thermoforming

FRP cooling tower performs regular attention to

FRP Cooling Tower Maintenance and Control parts:

Sprinkler Pipe:

The sprinkler pipe should be clean without stoppage. Release the set screw on sprinkler device, after that discard sprinkler pipe and clean the device. Keep align the dot mark on sprinkler head and reinstall it.

Sprinkler Head:

If the Sprinkler Head may be slow down or Stop to stuck, Release free the set screw on the head of sprinkler and loosen the nut,washer and clean it from fresh air water

Tower Casing:

In the FRP model cooling tower, the tower casing is do not want for coating. If its becomes soiled, erase it with soap or a water-soaked piece of cloth and then wash it thoroughly with water.

Water Basin:

Avoid the dust and dirt to get in the water basin at the bottom of drop in tank from time to time and keep the tank clean so that the strainer mesh will not be clogged.

Filling:

Thers is no specialized care for the quality of water control during machine operating time.

Fan:

Watch the surface of the blades carefully and maintained well the internal wall of tower casing and the tip of blades.

Coating:

Periodically recoat the metal parts as they specified for rusting.

Importance of Clean Operation:

Cause of Temperature problem,the Timber Cooling Tower materials must be kept very neat and clean. Avoid process of cooling tower will guide with that higher than water temperatures from results of two end of perspectives.

The Result of first system - chiller will propagate high energy because it must working at a higher than necessary condensing pressure to satisfy the load, due to the higher fluid temperatures provided by the cooling tower. Second,From attaining design cold water temperature the tower must operate longer at higher fan horsepower energy.

Regular Maintenance of FRP Cooling Tower:

Improvement of Maintenance:

At the time Every Service and Maintaining session, Change the exist or bad parts can increase performance of Frp cooling tower with today's technology. This Upgradation will increase the performance of energyconservation,good maintenance,restore the right condition.

GET IN TOUCH WITH Us
recommended articles
Info Center Knowledge Project
Why Solid Surface Counter Top Basins are the Best Choice for Busy Families?

In a fast-paced world where time is of utmost essence, busy families need products that can make their lives easier.
Solid Surface Tubs: The Best Choice for a Contemporary Bathroom

When it comes to designing your bathroom, selecting the right tub is an essential part of creating a lavish and comfortable space.
Introduction:

Adding a countertop basin to your bathroom can be a fantastic way to add some personality and style to your space.
Luxury and Durability Combined: Exploring Solid Surface Tubs

A warm bath is one of life's simple luxuries, and when it comes to choosing the perfect tub for your bathroom, there are a lot of considerations to keep in mind.
Transform Your Bathroom with a Stunning Solid Surface Tub

As an essential part of our home, the bathroom deserves to be a place where we can relax and unwind after a long day.
Unparalleled Elegance: The Allure of Stone Resin Bathtubs

Stone resin bathtubs sway the bathroom market with their unique, modern aesthetics mixed with an all-natural component.
Do Counter Top Basins Come in Different Shapes and Sizes?

If you're looking for a new countertop basin, you may be wondering if they come in different shapes and sizes.
Why Solid Surface Tubs Are the Best Choice for Your Bathroom?

If you are looking for the perfect solution to enhance the look and functionality of your bathroom, consider installing a solid surface tub.
How to Clean and Maintain Your Solid Surface Tub?

If you have recently installed a solid surface tub in your home, then you have made a great decision.
no data


About Us

KingKonree is not only a professional China sanitary ware brand, but also a specialist focus on exporting service since it's establishment in 2000. The products we prize is the combination of quality and design.

 Company Info

Address:Room No. 2408-2508, Building 5A, Longguang Jiuzuan, Longhua District, Shenzhen, China

Zip Code: 518131

Tel: +86 (0)755-82875700

Fax: +86 (0)755-82875921

Email: cherry@kingkonree.com

All rights reserved © 2024 Kingkonree International China Surface Industrial Co., Ltd | Privacy Policy Sitemap
Customer service
detect