KingKonree - Solid Surface Manufacturer of Sanitary Ware, Solid Surface Countertops & Sheets for over 25 years, innovation in moulding and thermoforming
The bathtub is a large part in the bathroom space. It will inevitably produce small episodes during its installation. Therefore, how to install the bathtub is particularly important. How to install it? Anything to pay attention to, let's take a look at it, and hope it will be helpful to you.
The first step is to choose the right size bathtub according to the bathroom specifications. I believe everyone will notice this. Choose the right bathtub size according to the size of your bathroom. Therefore, in the early stage of installation, you must first compare the size of the bathtub and the space reserved for the bathroom.
Before installing the bathtub, clean the bathtub, remove the screws on the legs for the legs, insert the squeeze female into the bottom groove of the bathtub, buckle the legs on the bathtub, wear the nuts, tighten and level. When the bathtub is like a bricklaying leg, the brick legs should be built, cement mortar should be applied, and the bathtub should be placed on the brick table and leveled; if the bathtub does not match the brick table, cement mortar can be used to fill and smooth.
When installing a long-neck faucet in a bathtub, such as installing a hot and cold water faucet on the wall, first align the nozzle of the water supply pipe with a short tube, measure the size of the puppet, saw the pipe threaded, and wipe one end Wrap the twine with oil, screw it into the nozzle, tighten and align it, and remove the twine. For example, when installing a mixed water gate with shower, remove the plugs of the cold and hot water pipe ports, use a short pipe with a threaded end to fit into the pipe port, try to align it, and put lead oil on the water inlet of the mixed water door and screw on the protective port. , Insert the key into the inlet, install it into the cold and hot water pipe port, check the size, keep the mouth close to the wall, then align the mixing nozzle with the inlet, tighten the nut, try to level it, and make a mark when it is suitable, and set the mixing water gate Remove, re-greased and numb before installation.
When installing the bathtub drain, put the bathtub drain tee nut on the drain horizontal pipe, wrap the asbestos rope, insert the middle port of the tee, tighten the nut, install the copper pipe in the lower port of the tee, and insert the copper pipe into the drain pipe. Flange the lower end, put a rubber pad under the tub bottom disc, put putty on it, insert it into the bathtub drain hole, put on the rubber pad and eye rims, put lead oil, wrap hemp, put putty on the threaded area. Use a fork to catch the cross ribs of the drain, inside the elbow. Put a nut on the overflow riser pipe, wrap the oil packing rope, insert the upper mouth of the tee, aim at the overflow hole of the bathtub, tighten the nut, add a 1mm thick rubber pad to the elbow of the overflow pipe, apply putty, and pass the bolt through The "one" threaded thread in the water elbow of the over-long pipe should not be loosened. Wrap the oil asbestos rope at the junction of the bathtub drain tee and the drain pipe, twist it firmly, and then seal it tightly with putty.
The above is the whole content of how to install the bathtub. I hope it will be helpful to you. For more exciting content, please continue to pay attention to our Qijia website.
More articles:
Precautions for purchasing toilets The size of toilets
Intelligent sanitary ware recommended by Anwar smart toilets
Recommended toilets How about Anwar toilets
toto toilets Installation precautions toto toilet installation