Bathtub is one of the products that many families can't live without. When we choose a bathtub, the first thing we will consider is installation. After we buy it, we don’t know how to go because we don’t understand it. Done. So everyone knows how to install the bathtub? What should you pay attention to when installing the bathtub? Today I will take a look at how to install the bathtub and what are the main points of the bathtub installation!
How about the bathtub? Appropriate installation
1. Before placing the bathtub, install the water fittings and close the water for 24 hours to see if there is water leakage in the bathtub. Pay special attention to the upper overflow. It is difficult to keep the water closed for 24 hours. Pour two buckets of water outside the bathroom and try to drain the water in the installed bathtub. This is more convenient for operation. When it was time for the actual installation, the bathtub was directly lifted into the bathroom and placed under the water.
2. When placing the bathtub, pay attention to that the other end of the drain is slightly higher than the end of the drain, so that the sewage will not be discharged smoothly in the future. This depends on the situation. The bathtub was originally suggested by Xiao Gong. It was observed that the bottom of the bathtub had a drainage slope. The four sides of the bathtub were leveled with a spirit level and tested with water. As expected, the water drained quickly. The bathtub maintains a visually level and beautiful appearance without affecting the drainage effect.
3. Although the cast iron bathtub is strong, its thermal conductivity is very fast. You should use medium river sand and spread it on the bottom of the bathtub. Fast and smashed. Bricklayers also recommend using foam. Considering that foam is not as fluid as river sand, it is suitable to fill all gaps. In the process of filling river sand, how to prevent sand from leaking into the sewer is a problem to be solved. After all the installation work is completed, the water will be tested again (this step is mainly to ensure that the moving bathtub does not cause the water to leak). After confirming that it is correct, wait for the bricklayer to build the skirt.
4. A hole with a height of 300mm and a width of 400mm is left at the drain, and a hole is cut according to the size, and the wood board (thickness 40mm) that has been water-proof and anti-corrosive treatment is cut according to the size, and calculated on the board The number and arrangement of the bricks are pasted on the wooden board with 903 construction glue. Put sealant on the edge of the bricks and inlay them on the box body
5. The tiles of the bathtub skirt do not need to be scratched. The red bricks are laid on the table and a layer of cement mortar is applied to the surface. , And then wait for two days to paste the tiles. Tiles are very troublesome. Because the ground has a slope and the bathtub is flat, each large brick must be polished to a different size. It cannot be polished a lot at once, it is easy to polish. It has to be grind repeatedly. The upper fortress of the brick is tucked under the round edge of the bathtub so that it does not form a positive angle.
Key points of bathtub installation
1. The low wall or reinforcing ribs around the bathtub should have sufficient supporting force, and the surrounding sand should be compacted and compacted;
2. Do not use bricks or other hard objects to support the bottom of the bathtub, so as not to damage the glaze during use;
3. p>4. Pay attention to the tight connection of the overflow pipe and the drain pipe;
5. Leave a drainage access port when attaching tiles. In order to look good on the surface, you can use glue to stick the tiles on the access openings, so that they are not visible from the outside, and it is convenient to remove the tiles during the overhaul;
6. Install the plumbing accessories before placing the bathtub. And do a 24-hour closed water test to see if there is water leakage at the joints;
7. When placing the bathtub, make sure that one end of the drain is slightly lower than the other end. The outer end should be slightly lower than the inner end;
8. The actual size of the bathtub may not be exactly the same as the nominal size. Please measure it on the spot when purchasing and installing, and reserve the normal Tolerance to facilitate installation.
When we install the bathtub, we need to pay attention to a lot of details, and learning how to install it is also very important. The above is how the bathtub is installed today.