< img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=5785916&fmt=gif" />
loading

KingKonree - Solid Surface Manufacturer of Sanitary Ware, Solid Surface Countertops & Sheets for over 24 years, innovation in moulding and thermoforming

 

Meijiahua Sanitary Ware: Pay attention to 'three preventions' during summer decoration to avoid water leakage

by:KingKonree     2021-08-19
Meijiahua Sanitary Ware: Pay attention to the 'three preventions' during summer decoration to avoid water leakage. When summer comes, there are always friends around you who complain about the bad things in the bathroom, that is, water leakage! Not only is it annoying and affects daily bathroom life, but sometimes it also affects the neighborhood downstairs and affects the harmony of the neighborhood. So why is it that the hotter the weather, the more likely it is to leak water? High water consumption and high temperature are the incentives. Compared with other seasons, the water consumption in the bathroom is much larger, and the temperature is also higher. If the waterproof layer is not carefully treated during the decoration, there will be some water leakage problems. The location and incentives of the water leakage are also They are not all the same, we need to make rectification plans based on different situations. For example, if there is water on the upper wall near the riser pipe, it may be the upper layer leaking; it may also be the upper layer leaking and bleeding down the pipe. There is water on the lower ground near the riser pipe. It may be caused by the upper layer leaking along the pipe. It may also be caused by problems with the riser pipe, the joints, valves, and cleaning ports of the house. The other wall surface bleeds on the top and the bottom of the roof bleeds, which is probably the cause of the upper layer. The water in the ceiling may also be caused by the upper ground, or it may be a leak in the pipeline in the ceiling of the household. Water in the middle of the wall is most likely to be leaking from the buried pipeline in the wall of the house. Therefore, there are many drainage pipes in the toilet, and the “three preventions” of waterproofing, anti-skid, and moisture-proof roof become extremely important. I would rather spend more time on decoration than repair during use. What are the 'three preventions' aspects of summer decoration that require us to pay more attention and work hard to avoid the various water leaks above? From the top cover, the moisture in the bathroom is relatively large. At present, the toilet and bathroom are integrated in the general building, so the toilet is often surrounded by water vapor, so the moisture-proof of the roof is very important. To make the toilet roof waterproof, it is best to apply a layer of water glass on the roof, and then use a PVC gusset with better waterproof performance. The gusset can be installed on the keel and can also cover the pipe. The waterproof layer needs to be treated repeatedly in multiple layers. When the new building is delivered to use, the bathroom is generally waterproofed, but most of the owner’s decoration will lay the floor tiles, level the ground, and re-lay the water pipeline, which will destroy the original waterproof layer of the bathroom. Therefore, the waterproof layer of the bathroom must be re-waterproofed when re-decorating. First level the ground with cement mortar, and then do waterproof treatment. Clean the ground first, and paint it with polyurethane waterproof coating 2 to 3 times repeatedly. The joints between the wall and the ground and the ground joints between the upper and lower water pipes are the most leaky places. The decoration team must be urged to deal with these corners and corners, and the waterproof coating must be applied in place. The decoration team is required to make cement mulch for the upper and lower water pipes of the kitchen and bathroom, brush 10 to 20 cm of polyurethane waterproof paint from the ground up, and then redo the polyurethane waterproofing on the ground to enhance the waterproofness. Waterproof experiments should not be neglected. After the waterproofing project is completed, seal the door and the drain, fill the bathroom floor with water to a certain level, and make a mark. If the liquid level does not drop significantly within 24 hours, especially for those living downstairs There is no leakage on the roof, and the waterproofing is qualified. If the acceptance is unqualified, the waterproofing project must be reworked as a whole and then re-accepted. Don't ignore this link. Many road decoration teams don't do waterproofing at all. They are all finished with glass glue. If the water leaks afterwards, it will be too late to remedy it. Therefore, waterproof experiments must be done. After confirming that there is no leakage point, lay the floor tiles. Although the bathroom occupies a small area in the home, its function is not small, especially in the hot summer. The most important thing for the bathroom is to bring us a cool and pleasant experience. The purpose of customizing a healthy bathroom space is to be less annoying, and to be more healthy and comfortable. (
Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Leave Your Message inputting...