< img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=5785916&fmt=gif" />
loading

KingKonree - Solid Surface Manufacturer of Sanitary Ware, Solid Surface Countertops & Sheets for over 24 years, innovation in moulding and thermoforming

 

Wrigley Bathroom The most detailed house decoration process (below)

by:KingKonree     2021-08-21
Wrigley Bathroom The most detailed house decoration process (below) The most complete house decoration process is here, take a small book and write it down! In the last issue, I shared the first 10 links of the whole decoration process with you in detail. The theme of this issue is the link after the whole process of decoration, please read on. 2. Analysis of 11 links after the whole decoration process 11. The wooden door was installed on the second day of the cabinet installation. After the wooden door was measured more than a month ago, it is now ready for installation. Hinges, door locks, and floor suction must be installed at the same time as the door is installed. The production cycle of solid wood doors is generally one month. Therefore, in order to keep the construction period tightly connected, it is necessary to let the wooden door manufacturer come to the door to measure the size of the door as soon as possible after the main body is dismantled and modified. Regarding the handling of door openings, everyone needs to pay attention. If the height of the door openings in the house is inconsistent, workers need to process it to the same height. 12. The floor can be installed the next day after the wooden door is installed. The floor installation needs to pay attention to the following issues: 1 .Before floor installation, it is best to ask the manufacturer to investigate whether the ground needs to be leveled or partially leveled. Some decoration companies or refurbishment teams will advise the owner to level the ground or partially level the floor. The actual survey of the floor manufacturer shall prevail; 2. Before the floor installation , The floor of the paved floor at home should be cleaned and the floor should be kept dry, so do not use water during the cleaning process. 13. Paving and pasting the wallpaper On the second day after the floor is installed, the home is cleaned up, and the wallpaper is ready to be pasted. If it goes well, it will also be a day. If possible, the floor should be protected on the day the wallpaper is laid; it doesn’t matter if there is no condition, and it’s okay to clean up the wallpaper glue left on the floor to Pioneer Cleaning. Before paving the wallpaper, try to do 'don't have anything' on the wall. 14. The switch socket is installed in the bathroom. All sockets and switches must be waterproof, and the sockets must be covered. For the light switch at the entrance, it is recommended to use an induction type or a fluorescent type. There should be more switch sockets than less, and at least one socket should be reserved in the place where the sockets are arranged. It should be noted that there are more and more household appliances in general. Once there are new appliances but no sockets, it is difficult to install them again. 15. After the lamps are installed and the lamps are installed, the home will be on. Say goodbye to the glare of the 100-watt incandescent bulb during the renovation. 16. Before installing the hardware and sanitary ware, install the plumbing fittings, bathroom accessories, toilets, drying racks, etc., all together. After the 'big pieces' in the front are installed, the house is still very 'cold'. After the lamps and hardware and sanitary ware are installed, the house is 'live'. 17. Curtain rod installation The installation of curtain rod marks the basic end of home improvement. 18. Before opening up and cleaning up, do not install curtains. When opening up and cleaning up, do not have furniture and unnecessary household appliances in the house. Try to keep more 'flat surfaces' so that the upland cleaning can clean up thoroughly. 19. Furniture comes into the market Regarding the purchase time of furniture, the earliest time is after the renovation of the water circuit is completed, so that we can roughly know the basic size range of the furniture. 20. Home appliances come in. At this time, the home appliances should come in, the installation should be installed, and it is ready to move in! 21. Home accessories Home accessories are the last step of home improvement, and it has changed from decoration to decoration, including the installation of curtains, which belong to the link of home accessories. As for buying curtains, it is best to order the furniture to avoid style conflicts. Home accessories can also consider buying some green plants, wall paintings, handicrafts and so on. (
Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Leave Your Message inputting...