< img height="1" width="1" style="display:none;" alt="" src="https://px.ads.linkedin.com/collect/?pid=5785916&fmt=gif" />
loading

KingKonree - Solid Surface Manufacturer of Sanitary Ware, Solid Surface Countertops & Sheets for over 24 years, innovation in moulding and thermoforming

 

Yangtze Sanitary Ware: Fixing tiles first or installing toilet first reveals the correct process

by:KingKonree     2021-09-16
Yangtze Sanitary Ware: Fix the tiles first or install the toilet first. Revealing the correct process When it comes to the decoration of a new house, the kitchen and bathroom are always the most important thing, but after the decoration is completed, there will be more or less flaws. Only experience will have experience. No one has a perfect decoration. Do you know the specific process of bathroom decoration? Should I put the tiles first or install the toilet first? Everyone’s answer is definitely different. Let’s discuss this question today. As far as toilet decoration is concerned, the decoration master usually lays the floor tiles before installing the toilet, and then needs to pay attention to the position of the toilet in advance, and determine the distance between the pits, and then lay the tiles. It is best to seal the bottom of the toilet with silica gel. Gap. Why install the toilet first after tiling the bricks? There are several reasons for this. 1. To facilitate the later maintenance of the toilet, what are the advantages if the floor tiles are laid first? Toilets are often used in our homes. After a long period of time, some malfunctions will inevitably occur, and we need to repair them. If you install the toilet first, you need to destroy the waterproof of the ground, damage the tiles on the ground, and knocking the tiles is also a time-consuming and troublesome thing. But if you put the tiles first, you can avoid these problems, and it's easier to repair. 2. Prevent water leakage. If the bricks are laid first, then the gap between the toilet and the bricks will be relatively small, which is less likely to cause water leakage and off-flavor in future use. If the toilet is installed first, it is not very convenient to install the tiles in the later stage. First, it is not easy to place the tiles near the toilet, and it is inconvenient to cut. And if the paving is improper, it is easy to leak water. 3. To effectively prevent the toilet from being damaged, tiling tiles first can protect the toilet to a certain extent. Why do you say that? In the construction process, laying bricks is an earlier process, and there will be many processes in the middle. If the toilet is dirty and broken during the construction, then the gain is not worth the loss. The cement mortar in the construction is also easy to make the toilet clogged and deteriorate. The construction steps of ceramic tiles and toilets. After figuring out whether the toilet is to install the toilet first or tiling first, we need to plan ahead and do a solid foundation work before the ceramic tile and toilet construction. 1. Hydropower renovation 2. Wall treatment 3. Floor tiles on the field 4. The toilet is considered comprehensively from all aspects. It is better to attach the tiles first. When decorating, it is not only the installation of the toilet, but also the construction process of the entire home. If we have a lot of processes and don’t know what to do, we must ask more about the residents in our own community, and we must not make random constructions. This will affect the quality of our entire decoration. (
Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Leave Your Message inputting...