Toilet waterproof repair plan

by:KingKonree     2021-10-01
Restroom waterproofing and leak repair plan Rifeng Sanitary Ware should keep in mind these points that the bathroom leaks, whether it leaks or leaks downstairs, are all troublesome things in life, which make many people very annoyed. Now I will introduce to you the experience I have summed up over the years, so that everyone can easily judge how to deal with it. One, if the toilet is leaking from the waterproof layer, rather than the water leakage of the upper and lower pipes. It can be repaired without the need to plan the tiles. The repair method is very simple. Use a new type of penetrating waterproofing agent to waterproof the surface of the bathroom again, so that the water does not enter the ground, but flows away directly from the waterway. Second, if it is a problem with the upper and lower water pipes. And the water pipe is underground, so you need to consider planing tiles, but it is not necessary to renovate the bathroom. For example, if the water inlet pipe is leaking, the pipe can be changed instead of the leaking water pipe. If the drain is leaking, it is also necessary to find the specific location of the leak. According to the situation, it is determined to be partially planed to solve the problem, and it is not necessary to plan all of it. The following is the solution to the problem: Reasons for toilet waterproofing and repairing methods: 1) Reasons for toilet water leakage: There are two reasons for toilet water leakage, the first is ground seepage, and the second is water leakage from the upper and lower water pipes. 2) How to judge the cause of water leakage: The method of judging ground water leakage: as long as the ground uses water, there will be water leakage downstairs. When the ground does not use water, there will be no water leakage downstairs; the method of judging water leakage in water pipes: general water pipes The leakage of water is large and continuous; pour water into the floor drain, hand basin, and toilet to determine whether there is a problem with the sewer pipe. If the toilet has not used water for several days, there is still water leakage and leakage If the water is not relieved, it is a water pipe problem. 3) Repair method for water leakage on the toilet floor (Note: As long as the water pipe is not broken, this method can be used to solve the problem of ground water leakage): 1. Clean the surface of dust, oil, water, etc., and keep the surface dry; 2. If the tile joints are filled with a caulking agent, you need to use a knife to make a small groove; 3. Spray penetrating waterproofing agent on the tile surface, tile joints, wall joints, pipe roots and other cement parts, and be sure to spray evenly 4. After the waterproofing agent is 90% dry (about 2 hours later), fill in all the tile joints and damaged and defective parts with joint compound, and use joint compound to reinforce the weak links around the root of the pipe; 5. Ground and Use plastic-steel mud to make waterproof edges at the wall joints and around the roots of the pipe; 6. After the waterproof construction is over, the construction parts should not be exposed to water within 24 hours. Construction process: base treatment → paste the elevation contour line with masking paper → apply the first emulsion → apply the second emulsion after drying → dry → closed water test Construction process: 1. Clean the grassroots and the original wall surface It is solid and should not have sand, dust, or hollow drums. 2. Clean the roots of the upper and lower water pipes and conduct leak plugging treatment. 3. Use 10-15mm wide masking paper to paste the contour line according to the design and construction height of the wall. 4. The first coat of lotion is applied, the order is from top to bottom, from inside to outside, without any omission. 5. After drying for 24 hours, apply the emulsion for the second time to form a complete waterproof layer. 6. After drying for 24 hours, do a 24-hour closed-water test, and the water discharge height is not less than 30mm, and no leakage within 24 hours is qualified. 7. After the surface cement mortar is roughened, it can be directly pasted for construction. Construction steps: the first step: do a good job in the basic hydropower project. From a safety point of view, it is better to go above the bathroom water pipes and wires than below. However, many 'guerrillas' are eager to save energy, use water and electricity on the ground, and even drill trenches and round holes in the bathrooms. Step 2: Clean up the grassroots and walls. House decoration and waterproofing involve balconies, kitchens, and bathrooms, but the focus is on bathrooms. First of all, use a small metal hammer to knock on the wall and the ground. If you find an empty sound of 'pupuThen carefully clean the four wall bases and the ground, pull out the iron nails, and clean up the dirt and garbage. It is best to rinse it with clean water and let it dry. The third step: do a good job of rigid waterproofing. The various drain pipes in the first level of the bathroom can not be changed, try not to change it; if it needs to be changed, do not use cement mortar to fill the pores. Be sure to plug the leak in three times. The most leaky parts of the room are around the drain pipe and the four sides of the corner, so these key parts should be paid special attention to. The ground around the ground should also be divided into three blocks, with intervals. In this way, a layer of rigid waterproof armor was worn on the ground. Make a slope in the bathroom threshold, paint it high to prevent water from flowing back to the outside room, and use fine cement mortar on the threshold stone to stop the leak. The fourth step: the elastic waterproof coating will take a long time to complete the second pass of the new house, the hard plugging king elastic coating will be alive and cracked due to settlement, thereby losing the waterproof effect. Therefore, it is necessary to add a second insurance-elastic waterproof coating. Generally, the wall is moisture-proof first, and it is more than 1.8 meters. Because people take a bath, water will be sprayed on the wall tiles. The gap between the tiles is large, and the water molecules can easily enter the wall and penetrate into the wall of the opposite room, causing the paint on the back of the bathroom to fall off and the wallpaper to become moldy and discolored. Make the wall moisture-proof, then paste the wall tiles, and then make the ground decoration waterproof. (
Custom message
暂无友情链接数据
Chat Online 编辑模式下无法使用
Leave Your Message inputting...